Applicate at building exterior wall insulation
On the premise of ensuring to meet the requirements of energy saving and heat preservation, the strength can meet the standard requirements of exterior decoration. There is no need for another protective layer or waterproof layer, which is constructed like ordinary cement mortar. It can be directly drilled and painted on the insulating layer.
Applicate at building interior wall insulation
On the premise of ensuring to meet the requirements of energy conservation and heat preservation, the strength can reach the standard of interior decoration, and can be directly decorated on the heat preservation mortar; the fire protection grade can completely meet the requirements of fire protection and fire prevention. Moreover, the construction is simple and convenient, which is the same as the traditional ordinary mortar construction technology.
General provisions
The construction scope and thickness of thermal insulation of microcrystalline inorganic thermal insulation mortar external wall (inner wall) shall meet the design requirements.
The construction unit shall carry out the construction according to the product description of the facrory
The construction unit should make a sample before carrying out large-scale construction.
construction
Material preparation: when the required materials enter the site, they shall be registered and inspected in accordance with relevant regulations, and shall be properly stored and managed.
Water and electricity preparation: distribute the power supply and water source according to the construction demand, and the water quality should conform to 《water standard for concrete mixing》JGJ63.
Tool preparation: before construction, the tools should be prepared in place, and the completeness of the tools and the debugging of the equipment should be carried out.
Staff training: the point is on products, technology, construction steps, precautions, safety measures and civilized construction.
Construction conditions: all embedded parts of the wall must be installed before this construction.
Protection of finished products: protect all embedded parts and management on the construction site to avoid damage or damage during construction.
Check and accept the base before construction, the base should be cleaned up, its surface flatness, verticality should meet the corresponding specification requirements.
When the microcrystalline inorganic thermal insulation mortar is used in the renovation project of the building, the base must be solid, and the powder of the original decoration surface should be cleaned.
maintain
Spray water and maintain it for more than seven days after painting to prevent the paste from reducing its strength and surface cracking.
| 黄频在线观看免费 | 成人黄色免费网站 | 99精产国品一区二区三区 | 三人成全免费观看电视剧高清 | 97人妻一区二区三区免费 | 精品成人A片久久久久久不卡三区 | 波多野吉衣 美乳人妻 | 精品亚洲无码AV | 老熟女 码A片 | 成人网站免费在线观看 | 亚洲国产精品99久久久久久久 | 无码秘 蜜桃一区二区 | 在线播放中文字幕 | 91丨九色丨国产熟女 熟女 | 91久久精品人妻一区二区三区蜜桃 | 亚洲AV综合AV一区二区三区 | 中文字幕人妻熟女人妻a 片 | 黄 色 视视频在线观看 | 中文字幕免费在线观看 | 少妇精品无码一区二区免费视频 | 国产精品乱码一区二区免费视频 | 久久久久久一级片 | 国产乱国产乱老熟300视频 | 91精品少妇高潮一区二区三区不卡 | 无码人妻久久一区二区三区蜜桃 | 国产精品三级片网站 | 国产精品海角社区视频 | 一本大道DVD中文字幕 | 91成人影库一级A片 寡妇熟妇高潮片AAA | 国产成人免费做爰视频 | 精品乱码一区内射人妻无码 | 精品国产乱码久久久久久蜜柚 | 国产精品亚洲一区二区三区妖精 | 三日本三级少妇99蜜桃视频 | 国产又粗又猛又爽又黄的免费摄影 | 蜜桃精品久久久久久久免费影院 | 91精品在线免费观看 | 国产精品久久久久久久蜜臀宾利 | 日韩在线一区二区三区 | 亚洲精品无码一区二区牛牛 |