Applicate at building exterior wall insulation
On the premise of ensuring to meet the requirements of energy saving and heat preservation, the strength can meet the standard requirements of exterior decoration. There is no need for another protective layer or waterproof layer, which is constructed like ordinary cement mortar. It can be directly drilled and painted on the insulating layer.
Applicate at building interior wall insulation
On the premise of ensuring to meet the requirements of energy conservation and heat preservation, the strength can reach the standard of interior decoration, and can be directly decorated on the heat preservation mortar; the fire protection grade can completely meet the requirements of fire protection and fire prevention. Moreover, the construction is simple and convenient, which is the same as the traditional ordinary mortar construction technology.
General provisions
The construction scope and thickness of thermal insulation of microcrystalline inorganic thermal insulation mortar external wall (inner wall) shall meet the design requirements.
The construction unit shall carry out the construction according to the product description of the facrory
The construction unit should make a sample before carrying out large-scale construction.
construction
Material preparation: when the required materials enter the site, they shall be registered and inspected in accordance with relevant regulations, and shall be properly stored and managed.
Water and electricity preparation: distribute the power supply and water source according to the construction demand, and the water quality should conform to 《water standard for concrete mixing》JGJ63.
Tool preparation: before construction, the tools should be prepared in place, and the completeness of the tools and the debugging of the equipment should be carried out.
Staff training: the point is on products, technology, construction steps, precautions, safety measures and civilized construction.
Construction conditions: all embedded parts of the wall must be installed before this construction.
Protection of finished products: protect all embedded parts and management on the construction site to avoid damage or damage during construction.
Check and accept the base before construction, the base should be cleaned up, its surface flatness, verticality should meet the corresponding specification requirements.
When the microcrystalline inorganic thermal insulation mortar is used in the renovation project of the building, the base must be solid, and the powder of the original decoration surface should be cleaned.
maintain
Spray water and maintain it for more than seven days after painting to prevent the paste from reducing its strength and surface cracking.
| 无码人妻一区二区三区水牛网 | 人妻AⅤ中出‘‘无码内射 一级a一级a爰片免费视频 | 中文字字幕一区二区三区四区五区 | 久久久无码精品亚洲日韩蜜桃 | 色婷婷精品久久二区二区密 | 成人网站免费观看完整版入口 | 国产精品爽爽久久久久久蜜臀 | 久久精品人妻少妇一区二区 | 国产又爽 又黄 免费网站校园里 | 苍井空一级婬片A片 | 波多野结衣被肉翻猛高潮 | 国产日韩欧美一区二区精品无码 | 东北嫖老熟女一区二区视频网站 | 粉嫩av浪潮av蜜臀绯色av蜜桃 | 无码人妻一区二区三区水牛网 | 黄色视频网站免费观看 | 精品中文无码一区二区三区视频 | 美女极品嫩苞无套内谢 | 亚洲Av无码乱码精品国产戴局长 | 亚洲中文在线视频 | 三日本三级少妇99蜜桃视频 | 一本一道久久综合 | 国产成人无码精品色欲天香 | 亚洲精品秘 无码一区二区0 | 欧美性猛交XXXX乱大交3 | 日本黑人乱偷人妻中文字幕 | 国产日韩高清无码 | 亚洲AV无码乱码国产精品视色 | 免费无码一级A片大黄在线观看 | 少妇AAAAAA片免费看 | 欧美性受XXXXXX黑人XYX性爽 | 水牛影视AV一区二区 | 特级婬片A片AAA毛片爱奴 | 精品国产乱码久久久久久免费舒淇 | 亚洲精品国偷拍自产在线观看蜜桃 | 欧美丰满熟妇BBBBBB乱大片 | 成人短视频在线观看 | 性一交一夜伦A片一级毛片A级 | 一区二区三区无码在线观看 | 9l视频自拍蝌蚪9l视频 |